Lexikon

Bitte wählen Sie die gewünschte Sprache.

A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
cable cross section
cable dimensioning
cable duct, cable run
cable entry
cable fire
cable fire stopping
calculated area of fire
calculation of protective
calming section
calorie
calorimeter
calorimetry
canopy
cantilever slap
capacity
carbon
carbon dioxide
carbon dioxide extinguisher
carbon dioxide fire extinguishing system
carbon dioxide installation
carbon dioxide X
carbondioxyde
carbonisation
carbonize
carbon monoxide
casing, panelling
cast in situ concrete
catalyst
catch fire
categorie of building material
cavity / hollow space
cavity wall
ceiling
ceiling / beam
ceiling/floor beam
ceiling/floor joist
ceiling / floor opening
ceiling shape
cellular construction
cement
central hazard control
central station
centrifugal pump
ceramic glas
chain reaktion
change of use
characteristic , property
charcoal
char damage
charge formation
charging set
chassis
check valve
chemical explosion
chemical protection
chemical protection clothing
chemical protection gloves
chemicat incident unit
chequered
chief fire officer
chief fire officer
chimmey effect
chimmey fire
chimmey hood, mantel
chimnay
chipboard
chlorinated carbon
civil code
civil protection
cladding
cladding, lining
cladding / facing
classification system
class of construction
class of fire
clearing, evacuation
clearing away
clearing up insurance
clearing up work
clear out
clear out X
clear up
cloakroom
coat
coating
coating X
coking
cold roof
cold store
collaps
collapse
collection head
collector
colour, paint
columne
combination lock
combination lock X
combustibility factor
combustible
combustible gas
combustible loading
combustible material
combustility
combustion
combustion behaviour
combustion chamber / area of fire
combustion equitation
combustion factor
combustion gases
combustion mechanism
combustion process
combustion process X
combustion property
combustion temperature
combustion zone
command and control
command car
commanding officer (officer in charge)
command of the operation
commitee of experts
compact storage
competent or responsible authority
complete combustion
component
composite ceiling
composite construction, building
composite method of building
composition of matter
composit panel
compound ( chemistry)
compressed air apparatus
concentration factor
concentration of material assets
concentration of value
concept, plan
concrete brick
concrete construction
concrete cover
condensate separator
conductivity
conductor (electr.)
conflagration
connection non permanently monitored
consequence of a fire
consequential damage
construction, structure
construction / building
contactor
container
container explosion
contamination clothing
contamination gloves
continuos tone
control / diplay panel
control and indicate equipment
control device
control function
control holder
control panel
control point
control point , command post
control post
control room
control time
control unit
control unit for gaz
control valve
convection
convection heat
conveyor
conveyor belt
conveyor X
cooling
cooling effect
copper foil
correction coefficient factor
corrosion
corrosions danger
corrugated asbestos sheet
corrugated sheet iron
cosequential losses
coupling
coupling spanner
course of instruction
crable
crack, joint
crack, split
cracking
crash tender
creation of fire compartments
crew
crew cab
crew leader
crib fire
critically, degree of dangerousness
cross bracing
cross zoning
crucible, press
crushing
current distribution
current strength
curtain wall
cutting
cutt off by grinding
cylinder lock
cylinder valve